October Approved Construction
411: 10.01.21 – 10.20.21 / 10.24.21 – 10.29.21
402: 10.01.21 – 10.07.21
305: 10.11.21 – 10.15.21
417: 10.27.21
314: 10.27.21 – 10.29.21 / 11.01.21 – 11.05.21
…
411: 10.01.21 – 10.20.21 / 10.24.21 – 10.29.21
402: 10.01.21 – 10.07.21
305: 10.11.21 – 10.15.21
417: 10.27.21
314: 10.27.21 – 10.29.21 / 11.01.21 – 11.05.21
…
103 – 07.14.21 – 07.27.21 Flooring
107 – 07.29.21- 08.03.21 Painting
…
06.14.21 – 405/305/205/105 hydrogeting – Jp Merlos
06.21.21 – 305 – Closet
06.25.21, 06.28.21-07.02.21 – 101 – Flooring & cabinets
…
05.19.21 101 Waterheater Replacement…
403 – water heater repair
417 – flooring & painting…
03.01.21 – 03.19.21 312 – Electrical work, audio, painting, fiber.…
02.01.21 – 02.25.21 (312) Electrical, computer, TV monitors
02.02.21 – 02.05.21 (416) Painting
02.04.21 (307) New ventless dryer
02.05.21 (301) Inspection done on Electrical
02.05.21 (215) New Waterheater…
12.02-12.16 HCI will be adjusting/fixing fire sprinklers.
12.05 Fountain lights are being exchanged. Fountain water is being drained and will be filled on 12.07.
12.15 Spectrum – Fiber optics team
12.16 Tree trimming proposal.…
12.01.20-12.03.20 #301 sliding doors and electrical work – slight drilling and vibrations.…
07.07.20 – Loft #118 – Changing out the Water heater…