Community


Figueroa Improvements/ Construction

If you live or work in the MyFigueroa area, you’ve likely noticed that construction is well underway on 11th Street. 11th Street is closed to one lane from Los Angeles Street to Figueroa, to allow for construction in the roadway and on the northern sidewalk. Please bear with us while we work to make 11th Street better for everyone walking, biking, and driving there!

Improvements coming soon to 11th Street include:

  • Wider, pedestrian-friendly sidewalks

  • A bike lane connecting to protected bike lanes on Figueroa

  • New curbs and better drainage

  • Improved traffic signals

  • Refurbished street lighting

MyFig Construction Starting Soon on Figueroa


Construction will also begin on Figueroa itself very soon. LADOT and the contractors are still finalizing traffic control plans, to ensure traffic can continue to flow as smoothly as possible during the construction of the new bus platforms.

The first phase will start this month in front of USC, between Exposition and 23rd Street – the removal of two median islands, followed by the installation of bus platform islands on Figueroa.

Please continue to share these details with others in the area and let them know that MyFigueroa will bring a better, safer, and more beautiful Figueroa Street to the neighborhood soon.

In the meantime, visit myfigueroa.com to Fig Out how to get around, and follow our twitterfacebook, and instagram for updates. You can also download and share our construction notice here!

For questions or concerns during construction, contact us!

View Source

Website Designed and Built by Elimint | Log in